• 2009-04-01 Status of the Detroit River International Crossing (DRIC) Project
• 2009-02-26 Density Inspection and Testing
• 2009-02-18 Complex and Simple Traffic Signal Operations
• 2009-02-13 Bridge Safety Inspection Consultant Prequalification QC Plan, Q&A
• 2009-01-30 Prequalification Requirement Change
• 2008-12-30 Geodetic Control and Leveling
• 2008-12-17 Technical Assistance Prequalification Addition
• 2008-11-07 PE/PS Requirement & Bridge Safety & Underwater Inspection Changes
• 2007-10-01 - Shut Down Update
• 2007-09-28 - Shut Down Possibility
• 2007-08-28 - Traffic Signal Operations
• 2007-07-17 - Consultant/Vendor Selection Changes
• 2007-06-18 - Traffic & Safety Services
• 2007-05-25 - Prequalification Letter Update
• 2007-04-26 - Prequalification Info
• 2007-04-24 - Fraud/Abuse Hotline
• 2009-07 Website Migration Update
• 2009-06 Website Migration
• 2009-05 Reporting Requirement for ARRA Funded Projects
• 2009-04 Guidelines for Price Escalation Clauses in Consultant Price Proposals
• 2009-03 Changes to the Consultant Selection Process
• 2009-02 Milestones or Lump Sum
• 2009-01 What is the Consultant Advisory?